Communication Specification
|
Format
|
RS-232 |
|
Baud rate
|
1200 bps |
|
Data
|
8 bits |
|
Start Bit
|
1 bit |
|
Stop Bit
|
1 bit |
|
Parity
|
None |
"MiniCOL" for MonUPS III (revision 1.2)
Query the status of UPS
Command from PC to UPS
| Header (1 byte) | Command (1 byte) | CSUM |
|---|---|---|
|
|
|
CSUM = 2’s complement of the SUM of the total package
UPS Status Feedback / Shutdown Request
Command from UPS to PC
| Header (1 byte) | Command (1 byte) | CSUM |
|---|---|---|
|
|
|
|
||
|
||
|
||
|
QE - UPS requests for System Shutdown. PC to read three consecutive QE bytes and acknowledge before proceeding with normal shutdown.
System & UPS Shutdown
- Step 1. Command from PC to UPS
-
Header (1 byte) Command (1 byte Integer) CSUM TXX(1~255)YY(
T- stands for Time-delay,XXis the delay factor in multiple of 10 seconds. So, max. delay time = 42:30 min.) - Step 2. Command from UPS to PC
-
Header (1 byte) Command CSUM (same as MCOL checksum) TAXX(
TA- stands for Time-delay command acknowledged) - Step 3. Command from PC to UPS
-
Header (1 byte) Command (1 byte) CSUM SDXX(
SD- stands for shutdown) - Step 4. Command from UPS to PC
-
Header (1 byte) Command (1 byte) CSUM SAXX(
SA- stands for shutdown acknowledged)
Miscellaneous
-
Software to poll the UPS at least 6 times in 2 seconds at program startup to determine if there is "NO COMMUNICATION" and advise "Please check cable connection", etc.
-
During normal operation, if software receives five checksum error, display "Communication Error".
-
If there is no response from the UPS, display "No Communication" (after 5 consecutive times) in RED colour (must be outstanding) .
-
PC to send a UPS shutdown delay
TXXand continue sending command until it receives a confirmation commandTAbefore sending ups shutdown commandSD.TXX- whereXXis a multiple of 10 seconds. So, maximum time delay is 42 minutes and 30 seconds (255 * 10 = 2550 seconds). -
Software to have a UPS Off Delay setting screen to accommodate item d. above.
-
PC must send a
SDcontinuously until it receives aSAfrom the UPS before system can perform shutdown. -
Baudrate = 1200 bps.
-
Software to perform system shutdown when it receives three consecutive system shutdown request bytes (
QE) from UPS. A pop-up message with 5 seconds countdown, and message ‘System powering down, shutdown in 5 seconds’ is to be displayed. The usual system shutdown (with autosaving of files) will take place (to include item d. & f. above).
Shutdown timeline